NGE: add stop time after trainrun modification in NGE #9332
Labels
area:front
Work on Standard OSRD Interface modules
component:nge
Macroscopic mode of Operational Studies module
kind:bug
Something isn't working
module:operational-studies
Multi-train simulation with structured studies management
severity:major
Major severity bug
What happened?
Trainrun modified in NGE triggers a recalculation of the nodes involved. It then results as a creation of another PR in the input timetable. The problem is that 2 differents items exist for the same PR, resulting in weird behavior:
Enregistrement.de.l.ecran.2024-10-14.150450.mp4
What did you expect to happen?
Nodes modified in NGE should result in creating a new PR in the input table
How can we reproduce it (as minimally and precisely as possible)?
It can be triggered after setting / un-setting a stop at a node for a trainrun in NGE, then look at the input table (bugged), then in macro again (bugged)
On which environments the bug occurs?
Recette (SNCF)
On which browser the bug occurs?
Firefox
OSRD version (top right corner
Account
button >Informations
)staging e66e534
The text was updated successfully, but these errors were encountered: